Shirtladze A.G., Moroz A.Yu.
Reviewed by reducing the cost, time and manpower in technological preparation of production engineering products at the expense of continuity, constructive solutions, the use of the same size and their borrowing from design-products previously developed.
Keywords: a technical solution selection, design, product, item, production unit, cost, time, resources, technological process and equipment.